Covina, CA
Replacing a roof in Covina: what it takes
Replacing a roof is four days of noise and one decision that lasts thirty years. It is worth an afternoon of comparing.
Describe the replacement job
Three questions, then the address. Up to three Covina contractors who do this work.
You are on the list.
No provider in Covina is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a replacement job. A contractor who has not raised them has not looked properly.
- Tear-off or overlay, and what the local code allows
- Which underlayment, and whether ice-and-water goes on the eaves and valleys
- A written per-sheet price for replacing bad decking
- How the site is protected, and who cleans up the nails
- Ventilation: what is there now, what it should be
A proper replacement is a tear-off, not an overlay. Going over the top of the old roof saves money on day one and costs it back at the next replacement, when there are two layers to remove and no way to inspect the deck.
Warranties come in two halves that get deliberately confused. The manufacturer covers the material, and only if it was installed to specification. The contractor covers the workmanship, and only for as long as they stay in business.
Two quotes at the same price can be very different roofs. Compare the layers, not the brand name on the shingle.
Locally
Close behind that: shaded slopes that never really dry out. Slopes that never get direct sun stay wet for hours after the fog burns off, and that is where moss, lifted shingles and soft decking start.
About replacement here
Do I have to hire anyone?
No. Take the quotes, sit on them, compare them, or throw them away. There is nothing to cancel and nothing owed.
How long should a roof last here?
Rated life and real life are different numbers. Here, ordinary rated life is a fair guide, provided the attic breathes. Ventilation and the quality of the installation move that more than the brand does.
I rent. Can I use this?
You can submit it, but the owner has to authorise any work, so the useful move is to get the landlord to make the request or to give you permission in writing first. Contractors will not start work for a tenant.
What if the decking is rotten underneath?
Expect a few sheets on most older roofs. Get the per-sheet rate in the contract. Open-ended decking charges are where a fixed price stops being fixed.
Ready for a real number?
Free, no obligation, and your details go to no company until you say yes.
