Covina, CA
The tile is fine. The roof might not be.
The most common tile job is not a replacement at all. It is a lift-and-relay: the same tile comes off, new underlayment goes down, the tile goes back.
Or call (626) 732-9852Describe the tile and slate job
Three questions, then the address. Up to three Covina contractors who do this work.
Your request is in.
We are matching it now against roofing contractors working in Covina and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Before you let anybody on the roof
The things worth pinning down on a tile and slate job. A contractor who has not raised them has not looked properly.
- Whether the tile can be salvaged and relaid
- Whether battens are being replaced at the same time
- Fastener specification, especially near salt air
- The condition and age of the underlayment beneath
- What percentage of tile breakage they expect and how it is priced
Walking a tile roof breaks tile. That is not carelessness, it is physics, and any honest contractor will tell you a small percentage will be lost and replaced.
Broken or slipped tiles are a maintenance item, not an emergency, provided the underlayment beneath is still sound.
Slate wants copper or stainless fasteners and a crew who has done it before. Steel nails on a slate roof is a hundred-year covering held down by a thirty-year fixing.
Locally
Close behind that: shaded slopes that never really dry out. Slopes that never get direct sun stay wet for hours after the fog burns off, and that is where moss, lifted shingles and soft decking start.
About tile and slate here
How many contractors will contact me?
No more than three. We picked that number because two quotes is not enough to spot an outlier and five is an ordeal.
How quickly will someone call?
Usually within the hour during working hours. If you marked the job as an emergency it goes to the front of the queue and is normally picked up faster than that.
Why does ventilation keep coming up?
Because a badly ventilated attic cooks the roof from underneath and takes years off it. Intake at the eaves and exhaust at the ridge, in balance. It is cheap during a re-roof and awkward afterwards.
Should I repair or replace?
It depends almost entirely on how much life is left in the material. Ask any contractor who inspects it to give you a number of years and a reason. If two of them independently say the same thing, believe it.
Ready for a real number?
No cost, no obligation, and never more than three contractors.
